Temporary system scaffold stair towers as per drawings. system scaffold stair towers shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Filing herewith for mechanical work as per plans submitted. No change in egress, use, or occupancy.
plumbing work filed in conjunction with apartment 11W renovation
Sidewalk Vault Waterproofing and related work.
Filing herewith for general construction as per plans submitted. No change in egress, use, or occupancy.
Suspended Scaffold for Facade Restoration and Inspection as Shown on Plans
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Combination of apartments 15C and 15D as shown on submitted plans. No change in occupancy, use or egress.
Planters and trellises installation at penthouse roof terrace.
Install new vrf heat recovery system for existing residential building.
Alteration of apartment interiors, installation of new finishes and fixtures
Herewith, filing for modification to the plumbing fixtures in APTS 5G, 7D & 9C. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Planters and trellises installation at penthouse roof terrace.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Alteration of apartment interiors, installation of new finishes and fixtures
Herewith, filing for modification to the plumbing fixtures in APTS 5G, 7D & 9C. NO CHANGE TO USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Combination of apartments 15C and 15D as shown on submitted plans. No change in occupancy, use or egress.
Install new vrf heat recovery system for existing residential building.
General construction including minor demolition and installation of non-load bearing partitions and related finishes. No changes in use, egress or occupancy.
Msk haupt or mitigation: plumbing and sprinkler modifications to accommodate the 4th floor or mitigation in the existing hospital building. no change to use, egress or occupancy.