Building Permits in ZIP 10065
Manhattan, NY — 851 permits filed recently
851 permits
Herewith filing for plumbing modifctaions in units 8j and 16c as per plans. no change to use, cocuapncy or egress.
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No change to use, egress...
Installation of temporary plywood fence as per plans during construction. no change in use, egress or occupancy. fence shall comply with chapter 33 of nyc building code of 2022.
Installation of pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Herewith filing for plumbing modifctaions in units 8j and 16c as per plans. no change to use, cocuapncy or egress.
Support of excavation for the construction of proposed elevator pits, grease interceptor and sump pit and column B1 expansion in the Cellar Level as per plans (Project Ruby.) No change to use, egress...
Application filed for boiler installation in the cellar as per plans filed herewith. this application will supersede application # 100485379
Installation of suspended scaffold for facade work or inspection.
Subsequent application filed for plumbing modifications/additions as per plans filed herewith. this application will supersede application # 100485379
General Construction work associated with the renovation of an existing single family townhome including reconfiguration of partitions and plumbing fixtures, reconstruction of existing bulkhead and fa...
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout P...
Interior renovation of Apartment 10M, no change in use, egress or occupancy
Installation of temporary audience seating riser & performance platform.
Plumbing with the renovation of existing duplex apartment #4 on the 2nd & 3rd floors. as per plans filed herewith. no change of use, egress, or occupancy.
Install (38) new heads, (1) jockey & (1) booster pump on the Cellar, (33) heads on the 1st Floor, (25) heads on the 2nd Floor, (48) heads on the 3rd Floor and associated Sprinkler Piping (Project Ruby...
Exterior restoration: brick replacement, coping replacement, stucco installation, roof repairs, and misc. facade repairs as plan. no change in use, egress or occupancy.
Installation of suspended scaffold for facade work or inspection.
Install new rooftop AC units for ventilation and kitchen exhaust, Install new outdoor/indoor VRF system, ductwork, refrigerant piping on the cellar, 1-3 and roof as per plans (Project Ruby/ Buildout P...
Plumbing with the renovation of existing duplex apartment #4 on the 2nd & 3rd floors. as per plans filed herewith. no change of use, egress, or occupancy.
Installation of pylwood fence as per plans. plywood fence shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this application.