Building Permits in ZIP 10065
Manhattan, NY — 841 permits filed recently
841 permits
Starr Roof: Structural Modifications to accommodate the roof replacement project as per plans. No change to use, egress or occupancy.
Convert two existing multi-family buildings into a single family residence including vertical enlargement at 4th floor and horizontal enlargement at 1st floor/basement.
Structural work associated with renovation/ repair of existing elevator shaft.
Facade Inspection/Repair
Installation of construction fence for new building construction as per plans. no change in use occupancy or egress under this application. construction fence shall comply with chapter 33 of the 2022...
Facade Inspection/Repair
Proposed interior renovation on 1st floor(apt. #2). ceiling, flooring & partition works as per plan. no change in use, bulk, egress or occupancy.
Installation of temporary overhead/ roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal, Installation and Relocation of Plumbing Fixtures, Gas Appliances and Storm Fixtures. As per plans filed herewith. No change to use, occupancy or egress.
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade Inspection/Repair
Installation of construction fence for new building construction as per plans. no change in use occupancy or egress under this application. construction fence shall comply with chapter 33 of the 2022...
Proposed interior renovation on 1st floor(apt. #2). ceiling, flooring & partition works as per plan. no change in use, bulk, egress or occupancy.
Installation of temporary overhead/ roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Facade Inspection/Repair
Removal, Installation and Relocation of Plumbing Fixtures, Gas Appliances and Storm Fixtures. As per plans filed herewith. No change to use, occupancy or egress.
Installation of temporary material hoist as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Structural work associated with renovation/ repair of existing elevator shaft.
Installation of 300psf sidewalk shed, construction fence and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under thi...
Plumbing work in conjunction with the interior renovation of an existing dwelling unit 11 on the 011 floor. no change in use, occupancy, or egress.