Building Permits in ZIP 10069
Manhattan, NY — 29 permits filed recently
29 permits
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
FACADE INSPECTION Designated Primary Site supervisor: Jesus Decola
Removal of non-structural partitions and associated finishes and the installation of new finishes for unit 46C. No change to use, egress, or occupancy.
Removal of non-structural partitions and associated finishes and the installation of new finishes for unit 46C. No change to use, egress, or occupancy.
Plumbing work related to the interior renovation of apt. 35d on the 35th floor. no change to use, egress, or occupancy.
Plumbing work related to the interior renovation of apt. 35d on the 35th floor. no change to use, egress, or occupancy.
Structural work associated with the upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Interior renovation of apt. 35d on the 35th floor. no change to use, egress, or occupancy.
Interior renovation of apt. 35d on the 35th floor. no change to use, egress, or occupancy.
Structural work associated with the upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Upgrade of the HVAC units for the Health Club & upper-level roof HVAC unit. No change in use, egress or occupancy.
Installation of 8 unit split system on the roof and floor with a total capacity of 8 tons. no change to egress, use, or occupancy.
Installation of 8 unit split system on the roof and floor with a total capacity of 8 tons. no change to egress, use, or occupancy.
Replacement, relocation and new installation of sprinklers in existing duplex apts 12A/14A, 11th & 12th floors. No change inuse, egress, nor occupancy.
Hereby filing for the renovation of unit 18c. no change in use, egress or occupancy.
Hereby filing for the renovation of unit 18c. no change in use, egress or occupancy.
Plumbing work in conjunction with renovation of apt 26e on the 26th floor. no change in use, egress or occupancy.
Plumbing work in conjunction with renovation of apt 26e on the 26th floor. no change in use, egress or occupancy.
Alt-2 filing. plaza and garage repairs. no change in use, egress, or occupancy.