Building Permits in ZIP 10075
Manhattan, NY — 384 permits filed recently
384 permits
Reinforcement of existing masonry bearing wall. no change in use, egress or occupancy.
Installation of Mechanical systems for new 16-story medical office building core/shell and fit-out areas inclusively.
Hereby filing for the renovation of unit 23a (installation of plumbing fixtures). no change in use, egress or occupancy.
Hereby filing for the renovation of unit 23a (installation of plumbing fixtures). no change in use, egress or occupancy.
Reinforcement of existing masonry bearing wall. no change in use, egress or occupancy.
Installation of Mechanical systems for new 16-story medical office building core/shell and fit-out areas inclusively.
Plumbing work of single-family residence. no change of egress, use or occupancy
Facade repairs. no change in use, egress or occupancy. sidewalk shed and scaffolding to be designed and filed by others.
Plumbing work of single-family residence. no change of egress, use or occupancy
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Facade repairs. no change in use, egress or occupancy. sidewalk shed and scaffolding to be designed and filed by others.
Installation of temporary pipe scaffold at the south (front) from the top of the sh bridge past the main roof parapet, north ( rear) elevation from the ground and setback to past main rf parapet.
Replacement of existing plumbing fixtures and removal of tub, installation of new shower.
Installation of suspended scaffold for facade work or inspection.
Installation of the sidewalk shed front of the building at 17 east 77th street
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of the sidewalk shed front of the building at 15 east 77th street
Installation of temporary construction fence as per plan.
Plumbing works as shown in plans at apt 2e on the 2nd floor. no change in egress, occupancy or use.
Installation of temporary pipe scaffold at the south (front) from the top of the sh bridge past the main roof parapet, north ( rear) elevation from the ground and setback to past main rf parapet.