Building Permits in ZIP 10075
Manhattan, NY — 384 permits filed recently
384 permits
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith
Filing for modificaiton of mechanical system with associated ducts and piping - club pilates
Mechanical work filed in conjunction with renovation of existing apartment #2 on the 2nd floor. install through-wall air conditioners and bathroom exhaust as per plans associated construction filing m...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed at the east neighbor's (162 e 80th st) side yard property line.
Temporary shoring and miscellaneous beam repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Filing application to combine units 15C and 15E as per TPPN 3/97. Work includes installation of interior non-load bearing partitions. Plumbing filed subsequently in DOB NOW. No change to use, egress o...
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
installation of construction fence
Moderate interior renovation of apt #2 consisting of partitions, gwb, trim, tile, millwork, cosmetic finishes, and replacement of bathroom fixtures as indicated. no change to egress, occupancy, or use...
Mechanical work filed in conjunction with renovation of existing apartment #2 on the 2nd floor. install through-wall air conditioners and bathroom exhaust as per plans associated construction filing m...
Moderate interior renovation of apt #2 consisting of partitions, gwb, trim, tile, millwork, cosmetic finishes, and replacement of bathroom fixtures as indicated. no change to egress, occupancy, or use...
installation of construction fence
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy. the sidewalk shed at the east neighbor's (162 e 80th st) side yard property line.
Filing for modificaiton of mechanical system with associated ducts and piping - club pilates
Erect, maintain & dismantle of scaffold for facade repairs per drawings attached herewith
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing application to combine units 15C and 15E as per TPPN 3/97. Work includes installation of interior non-load bearing partitions. Plumbing filed subsequently in DOB NOW. No change to use, egress o...
Temporary shoring and miscellaneous beam repairs as shown on the drawings filed herewith. No change in use, egress, or occupancy.
Installation of domestic W/S - Plumbing & Medical Gas plumbing fixtures with associated piping for in conjunction with interior fit-out of new 16-story medical office building as per plans filed herew...
Installation of temporary pipe scaffold as per plan. no change in use, egress, or occupancy. the pipe scaffold is top of the sidewalk shed and passes the main roof parapet wall, building front of the...