Building Permits in ZIP 10119
Manhattan, NY — 93 permits filed recently
93 permits
Interior demolition of non load bearing partitions on the 15th floor (NE corner) as indicated on drawings.
Interior demolition of non load bearing partitions on the 10th floor (part of northside suite) as indicated on drawings.
Herewith filing for the installation of a new demising wall as reflected in plans submitted. No change in use, egress or occupancy is proposed under this application.
Herewith filing for the installation of a new demising wall as reflected in plans submitted. No change in use, egress or occupancy is proposed under this application.
Replace existing non-illuminated sign (neuberger)
Replace existing non-illuminated sign (neuberger)
Installation of engineered enclosure and roof protection as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Installation of engineered enclosure and roof protection as shown on drawings. no change in use egress or occupancy. we shall comply with chapter 33 of 2022 b.c
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Sprinkler work on the 10th floor (LB Pharama) as indicated on drawings.
Construction work on the 10th floor (LB Pharma expansion) as indicated on drawings.
Construction work on the 10th floor (LB Pharma expansion) as indicated on drawings.
Mechanical application Filed related to interior renovation of commercial space located on the ground floor, no change to use, egress or occupancy.
Filed for interior renovation of commercial space located on the ground floor remove/replace non-bearing partitions & finishes as per plans; no change to use, egress or occupancy.
Mechanical application Filed related to interior renovation of commercial space located on the ground floor, no change to use, egress or occupancy.
Filed for interior renovation of commercial space located on the ground floor remove/replace non-bearing partitions & finishes as per plans; no change to use, egress or occupancy.
Herewith filing for related plumbing work as per the plans.
Herewith filing for related plumbing work as per the plans.
Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.
Interior demolition of non load bearing partitions on the 4th floor as indicated on drawings.