Combination of apartment 2W-3W as per Memo 3/97. Installation of pre-fab steel spiral stair and new floor opening, minor layout changes
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
In unit 7g+7f on floor 7, removal and installation of non-loadbearing partitions as shown on plans to combine two apartments. all plumbing work filed under separate application. no change to egress, u...
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
In unit 7g+7f on floor 7, removal and installation of non-loadbearing partitions as shown on plans to combine two apartments. all plumbing work filed under separate application. no change to egress, u...
Combination of apartment 2W-3W as per Memo 3/97. Installation of pre-fab steel spiral stair and new floor opening, minor layout changes
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed interior renovation of existing apartment with new finishes. no change in use, egress and occupancy.
Hvac system and ventilation installation for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.
Filing for replacement of main and bulkhead roofs, replacement of roof and balcony railings,facade repairs, balcony and walkway repairs and coatings, interior partition construction as per plans. no c...
Plumbing fixtures installation for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy
Knuckle boom truck use as per drawings. knuckle boom shall comply with nyc building code. dot/mta permits filed separately by others.
Sprinkler system modification for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.
Installation of temporary construction fence as per plan. no change in use, egress or occupancy.
Inspection using industrial rope access techniques and methods. See attached plans designated primary site supervisor: Gabriel Hurtado
Herewith filing for support of excavation work as per plans
Vanilla box renovation for commercial space c on 1st and cellar including reinstalling convenience stair fl as per plans filed herewith. no change to use, egress or occupancy
Plumbing work in conjunction with renovation of apt 3b on the second floor. no change in use, egress or occupancy.
Hvac system and ventilation installation for commercial spaces a,b and c as per plans filed herewith. no change to use, egress or occupancy.