Building Permits in ZIP 10128
Manhattan, NY — 762 permits filed recently
762 permits
Plumbing work related to the interior renovation of apartment 14a on the 14th floor. no change to use, egress, or occupancy.
Alteration filed for minor Plumbing and Sprinkler work as per plans filed. Subsequent filing to Alt #M01344470.
Alteration filed for minor Plumbing and Sprinkler work as per plans filed. Subsequent filing to Alt #M01344470.
Installation of suspended scaffolding for facade inspection/repair.
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
Installation of suspended scaffolding for facade inspection/repair.
Plumbing work inconjunction with Alteration
Hereby filing interior renovation of apartment #12b, including new non-load bearing partitions, (1) new hvac unit and sleeve, (1) new thru-wall air exhaust termination and sleeve with replacement wind...
Plumbing work related to the interior renovation of apartment 14a on the 14th floor. no change to use, egress, or occupancy.
Filing for temporary sidewalk shed. No change in use, egress or occupancy.
Replace and install plumbing fixtures. No change of use, egress, or occupancy under this application.
Installation of suspended scaffold for facade work or inspection.
Alteration filed for minor Plumbing and Sprinkler work as per plans filed. Subsequent filing to Alt #M01344470.
Filing for interior renovation of apt 13a as per plans submitted herewith.
Mechanical work for apartment 9b at the address listed. includes new split dx system(s), kitchen, toilet & laundry exhaust systems. natural ventilation provided, refer to ot application drawings(archi...
Fiing herewith for the interior renovation for the removal and construction of non load bearing partitions and finishes as per plans. There is no change to use, egress, and occupancy.
Installing self venting washer dryer units in 5 apartments on existing utilities
Remove , replace relocate and install new plumbing fixtures in conjunction with the interior renovation and restoration of apt r14d and apt r14e, on the 8th floor . all as per plan , filed herewith .
Install two (2) new condensers in courtyard and four (4) new indoor units in four elevator machine rooms in cellar.
Herewith filing for conversion from a residential townhouse to school occupancy per plans.