Building Permits in ZIP 10128
Manhattan, NY — 757 permits filed recently
757 permits
Facade Restoration
Interior renovation of Apt 14A as per plans filed herewith. No Change to use, egress, nor occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Mechanical work for the Gas service upgrade & chimney liner installation. No change in use, egress or occupancy.
Facade Restoration
Interior renovation of Apt 14A as per plans filed herewith. No Change to use, egress, nor occupancy.
Mechanical work for the Gas service upgrade & chimney liner installation. No change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Minor interior partition removals and construction inconjunction with renovation of apartment #12b. renovate bathroom + kitchen. no change to use, occupancy or egress.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Herewith file plumbing plans for existing duplex unit 16G on 15th and PH FL. remove and replace all kitchen plumbing fixtures, remove, replace, cap all plumbing fixtures filed in conjunction with gc....
Main Roof and setback roofs replacement and facade repairs No change in egress, use and occupancy.
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Main Roof and setback roofs replacement and facade repairs No change in egress, use and occupancy.
Herewith file plumbing plans for existing duplex unit 16G on 15th and PH FL. remove and replace all kitchen plumbing fixtures, remove, replace, cap all plumbing fixtures filed in conjunction with gc....
Installation of a temporary Material hoist per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Lobby renovation to include new tiles and wall tiles, replacement of doors as indicated in plans. There is no change in use, egress or occupancy under this application
Lobby renovation to include new tiles and wall tiles, replacement of doors as indicated in plans. There is no change in use, egress or occupancy under this application
1. repair boiler room floor and provide new finish flooring. repoint interior masonry wall. patch plaster at ceiling. 2.patch and repair exist. plaster ceiling on first floor. 3. remove window pane at...