Building Permits in ZIP 10452
Bronx, NY — 471 permits filed recently
471 permits
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. no change in use occupancy or egress under this application. live load 300 per square feet. sidewalk shed shall com...
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Exterior facade repairs with facade inspections with 3 life-lines, install outrigger beams and beta-max roof hoist. sidewalk shed filed under separate application.
(please assign to dev hub, to the same examiner as job #X01233373-I1 as this is one zoning lot with the same owner and applicant ) PROPOSED NEW 13 STORY BUILDING
Application file to 1nstallation of debris chute at front elevation. no change in use, egress or occupancy under this application.
Proposed 4 story 8 family residential building.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
(please assign to the dev hub) PROPOSED NEW 8 STORY BUILDING
Installation of 6000 lb dual personnel hoist car as per plans during construction. hoist shall comply with chapter #33 of the 2022 code. no change in use, egress, or occupancy under this application.
Work includes per the filed plans addition of exterior structural bearing masonry wall elevator hoistway, installation of exterior concrete ramps, stair and retaining wall and associated foundations....
Installation of pipe scaffolding as per plans. pipe scaffolding shall comply with chapter # 33 of the 2022 code. no change in use occupancy or egress under this application.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Suspended scaffold outrigger systemfor exterior facade restoration.
Proposed 4 story 8 family residential building.
Work includes per the filed plans addition of exterior structural bearing masonry wall elevator hoistway, installation of exterior concrete ramps, stair and retaining wall and associated foundations....
Exterior facade repairs with facade inspections with 3 life-lines, install outrigger beams and beta-max roof hoist. sidewalk shed filed under separate application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary overhead protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Suspended scaffold outrigger systemfor exterior facade restoration.