Building Permits in ZIP 10453
Bronx, NY — 309 permits filed recently
309 permits
Facade Repair Project. No change in use, egress or occupancy.
Mechanical work as per plans filed.
Plumbing fit-out as per plans herewith. No change to use egress or occupancy.
Foundation work for new building.
Existing 3-Story and basement, 2-Family building, to be converted to a 8-Family residential
Structural work for new building.
Foundation work for new building.
Existing 3-Story and basement, 2-Family building, to be converted to a 8-Family residential
Structural work for new building.
Application filed to resolve dob violation 100725cpi20504sb repair exterior brick and stucco wall.
Moderate tenant in place interior apartment renovation to include the removal and replacement of kitchen cabinets, countertops and appliances. new apartment light fixture, finishes and windows. all pu...
Full Demolition of Existing 2 Story Building
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Equipment use: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. e...
Replace roofing on existing roof deck. provide new stationary engineers control room with multi-purpose training room and renovate break room on first floor. replace finishes and fixtures in existing...
Application filed to resolve dob violation 100725cpi20504sb repair exterior brick and stucco wall.
Equipment use: dual 7000 # capacity personnel/material hoists during nb const, filed sep. hoists shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application. e...
Moderate tenant in place interior apartment renovation to include the removal and replacement of kitchen cabinets, countertops and appliances. new apartment light fixture, finishes and windows. all pu...
Replace roofing on existing roof deck. provide new stationary engineers control room with multi-purpose training room and renovate break room on first floor. replace finishes and fixtures in existing...
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola