Building Permits in ZIP 10463
Bronx, NY — 430 permits filed recently
430 permits
Sturctural application being filed for new building.
Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 2811 exterior streetbronx, ny 10463.
Suspended scaffold outrigger system for exterior facade restoration work and facade inspection at 2811 exterior streetbronx, ny 10463.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of a temporary supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio...
Filing to remove existing peerless oil-fired boiler model# ect-e-04-175su with dob id# 62841 and also remove ex oil tank located at cellar fl. work as per plans.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Filing to remove existing peerless oil-fired boiler model# ect-e-04-175su with dob id# 62841 and also remove ex oil tank located at cellar fl. work as per plans.
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...
Installation of a temporary supported scaffold and needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicatio...
Installation of a temporary roof protection per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filing for plumbing work as per plans. no change in use, egress or occupancy.
New 12'-0 wide Curb cut on Sedgwick Avenue. Filed in conjunction with NB X01080947-I1
Filing for garage repairs as per plans. no change in use, egress or occupancy.
8904-MH Disconnecting 2 existing RTUs and replacing units for future tenant as per plan. No new gas piping all work done after Gas shutoff valve. No change in egress use group or occupancy group. Prof...
Installation of suspended scaffold & material hoist for exterior facade repairs and facade inspection. suspended scaffold & material hoist shall comply with chapter 33 of the 2022 nyc bc. no change in...