Building Permits in ZIP 10465
Bronx, NY — 207 permits filed recently
207 permits
Filing herewith tax abatement application for installation of roof mounted solar panels. no change in use, egress or occupancy.
Interior renovation including finishes and partitions work of existing retail space. no change in use, egress or occupancy.
Interior renovation for an existing dunkin dounts service restaurant @1st. floor. Minor upgrades to exterior facade through painted finishes and material upgrades. No change in use, egress and occupan...
Application herewith filed for vertical and horizontal enlargement of existing 1 story and cellar wood frame building to include interior renovation of existing first floor and cellar. this detached b...
Proposed plumbing and sprinkler work. all as per plans filed herewith.
Connect gas line to new havc, no change to use occupancy or egress.
Partial demolition of fire damaged rear portion of the building with temporary shoring and stabilization of the remaining structure. all work to be performed under the supervision of a nys professiona...
Connect gas line to new havc, no change to use occupancy or egress.
Proposed plumbing and sprinkler work. all as per plans filed herewith.
Plumbing work for existing dunkin dounts service restaurant. no change in use, egress and occupancy.
Job to be assigned to development hub as per our HUB consultation. Filing herewith for a 1 story building framed with steel (Facility Building).
Installation of solar panels, rooftop, grid tied, railed, 14 modules, 5.74 KW
Installation of solar panels, rooftop, grid tied, railed, 14 modules, 5.74 KW
Plumbing work for existing dunkin dounts service restaurant. no change in use, egress and occupancy.
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Installation of photovoltaic solar array on existing roof system as per plans
Construct a new curb cut as per the drawings herewith filed. No change in egress, use, or occupancy.
Legalize partiton
Installation of photovoltaic solar array on existing roof system as per plans
Construct a new curb cut as per the drawings herewith filed. No change in egress, use, or occupancy.