Building Permits in ZIP 10468
Bronx, NY — 306 permits filed recently
306 permits
Cap & remove 3 showers, Relocate 1 mop sink, 5 water closets, relocate 4 lavs, 1 new water fountain, 8 new sinks, 1 new urinal, 2 new water closets , 4 new lavs
Installation of construction fence for public protection from areas of work.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Proposed installation of heavy duty sidewalk shed for remedial repairs as per plans. No change in use, occupancy, or egress under this application. Live load 300 per square feet. Sidewalk shed shall c...
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of nyc code 2022. no change in use, occupancy or egress under this application.
Installation of construction fence for public protection from areas of work.
Cap & remove 3 showers, Relocate 1 mop sink, 5 water closets, relocate 4 lavs, 1 new water fountain, 8 new sinks, 1 new urinal, 2 new water closets , 4 new lavs
X430_Extend existing basement east end sprinkler main into storage areas.
Foundation work for 12 story residential new building.
Convert existing physical culture establishment to trade school for adults. No change to bulk or egress
Support of excavation for new building foundations. Excavation support consists of drilled soldier piles and timber lagging as per plans.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Support of excavation for new building foundations. Excavation support consists of drilled soldier piles and timber lagging as per plans.
Convert existing physical culture establishment to trade school for adults. No change to bulk or egress
Foundation work for 12 story residential new building.
X430_Extend existing basement east end sprinkler main into storage areas.
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Fence application hereby filed in conjunction to application #210181989.
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.