Building Permits in ZIP 10468
Bronx, NY — 306 permits filed recently
306 permits
Ps 886x, installation of temporary boiler breeching and stack, steam, condensate, and make-up water piping submitting on behalf of the contractor in conjunction with dob # x01130125. no change in use,...
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of the nyc building code. live load 300psf.
Installation of New Plumbing System in conjunction with NB.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Application being filed to correct ecb violation number35690006j and for facade repairs including: brick masonry re-pointing/re-stitching, window lintel replacement,re-caulking, window sill patching/r...
Proposed construction fence, no change to use, egress or occupancy under this application.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Proposed construction fence, no change to use, egress or occupancy under this application.
Application being filed to correct ecb violation number35690006j and for facade repairs including: brick masonry re-pointing/re-stitching, window lintel replacement,re-caulking, window sill patching/r...
Fire protection specification in conjunction with nb# 220212543.
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
General Construction to Support Boiler Replacement Project
Full demolition to a one story building
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Replace existing steam boiler with new hot water boiler. Existing Steam piping in the building with be replaced with new.
General Construction to Support Boiler Replacement Project
Installation of temporary sidewalk shed per plan submitted. No change in use, egress and/or occupancy with this application.
Mechanical means submitted for use of mechanical equipment on grade at the time of demolition
Full demolition to a one story building