Facade repairs to address fisp conditions as per plans filed herewith. No change in use, egress or occupancy.
Legalize repair of fire damaged wood beams, new steel girder to replace wall
Facade repairs to address fisp conditions as per plans filed herewith. No change in use, egress or occupancy.
Facade repairs to address fisp conditions as per plans filed herewith. No change in use, egress or occupancy.
Legalize repair of fire damaged wood beams, new steel girder to replace wall
Facade repairs to address fisp conditions as per plans filed herewith. No change in use, egress or occupancy.
Construction work on 2nd floor of existing house to remove partitions, install partitions for bathroom as plan to remove violation 35719287l. plumbing work under x01300616-s1 and mechanical work under...
Construction work on 2nd floor of existing house to remove partitions, install partitions for bathroom as plan to remove violation 35719287l. plumbing work under x01300616-s1 and mechanical work under...
Install a new sump pump and replace a section of associated piping with new.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Install a new sump pump and replace a section of associated piping with new.
Remove and replace existing Vacuum pumps and condensate return units with new zone control valves.
Alt-GC Filing for Partial 2nd Floor Horizontal Enlargement, on an Existing 2 Story Building at a DEP-owned facility, along with Upgrading Existing Exterior Fenestration. No Change in use & Occupancy
Exterior upgrades and roof replacement of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes to use, egress, or o...
Exterior upgrades and roof replacement of 6-story nycha multiple dwelling as part of the nycha pact renovation in conjunction with required local law inspection (fisp). no changes to use, egress, or o...
Alt-GC Filing for Partial 2nd Floor Horizontal Enlargement, on an Existing 2 Story Building at a DEP-owned facility, along with Upgrading Existing Exterior Fenestration. No Change in use & Occupancy
provide new concrete pads for new Condensate return units and columns repairs as required
provide new concrete pads for new Condensate return units and columns repairs as required
FISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decola
Installation of solar pv system. no change to use, egress, or occupancy.