Building Permits in ZIP 10474
Bronx, NY — 142 permits filed recently
142 permits
Proposed 8' tall construction fence
Replacing nine evaporators serving Fish Market and re-connect to existing refrigerant piping on first floor as per plans filed herewith.
Instalation of one new air cooled condensing unit on roof, two evaporators on first floor and related refrigeration piping as per plans filed herewith.
Replacing nine evaporators serving Fish Market and re-connect to existing refrigerant piping on first floor as per plans filed herewith.
Proposed 8' tall construction fence
Instalation of one new air cooled condensing unit on roof, two evaporators on first floor and related refrigeration piping as per plans filed herewith.
Proposed vertical & horizontal enlargement of existing automobile retail/repair shop and change use to Produce wholesale/storage warehouse. LOW ENERGY BUILDING- AS PER C402.1.1 (2) THIS APPLICATION IS...
Proposed vertical & horizontal enlargement of existing automobile retail/repair shop and change use to Produce wholesale/storage warehouse. LOW ENERGY BUILDING- AS PER C402.1.1 (2) THIS APPLICATION IS...
Proposed vertical & horizontal enlargement of existing automobile retail/repair shop and change use to Produce wholesale/storage warehouse. LOW ENERGY BUILDING- AS PER C402.1.1 (2) THIS APPLICATION IS...
Proposed vertical & horizontal enlargement of existing automobile retail/repair shop and change use to Produce wholesale/storage warehouse. LOW ENERGY BUILDING- AS PER C402.1.1 (2) THIS APPLICATION IS...
Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.
FOUNDATION FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. ALT1 APPLICATION #X01006930-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
FOUNDATION FOR BATTERY STORAGE AS PER PLANS FILED HEREWITH. ALT1 APPLICATION #X01006930-I1. HUB CONSULTATION ACCEPTED ON FEBRUARY 13th BY PLAN EXAMINER RAMI BITAR.
Installation of temporary construction fence for site security during construction as shown on the drawings filed herewith.
Interior renovation in existing two family house. all walls to be plastered, compound and paint in the first & second floor. no change in use, occupancy or means of egress.
Interior renovation in existing two family house. all walls to be plastered, compound and paint in the first & second floor. no change in use, occupancy or means of egress.
Per HUB consultation on February 13th with Rami Bitar. NB Filed herewith for battery energy storage system (ESS) as per plans filed herewith.
Plumbing Modifications and Fixture Installations associated with Freezer Renovation. No change to use, egress, or occupancy.
Plumbing Modifications and Fixture Installations associated with Freezer Renovation. No change to use, egress, or occupancy.
Application herewith filed to secure metal racks to floor of existing building. no change in occupancy, use, egress, or bulk.