Building Permits in ZIP 10475
Bronx, NY — 131 permits filed recently
131 permits
Modifications to existing PLUMBING systems. No change in use egress or occupancy.
Replace plaza deck roof drains associated with the plaza deck membrane replacement
AT&T - Replacement of antennas with removal and installation of RRH units on roof. Retrofit of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occu...
AT&T - Replacement of antennas with removal and installation of RRH units on roof. Retrofit of cabinets on existing equipment platform on roof. All work in compliance with TPPN 5/98. No change to occu...
Replace plaza deck roof drains associated with the plaza deck membrane replacement
Replacement of gas meter on the 1st floor (4046 boston rd.). work includes replacement of gas meter w/ piping, gas test, and gas authorization (blue card) for the utility company. no change in use, eg...
Replace existing RTU units. There is no change in use, occupancy, or egress.
Replacement of gas meter on the 1st floor (4050 boston rd.). work includes replacement of gas meter w/ piping, gas test, and gas authorization (blue card) for the utility company. no change in use, eg...
Replacement of gas meter on the 1st floor (4046 boston rd.). work includes replacement of gas meter w/ piping, gas test, and gas authorization (blue card) for the utility company. no change in use, eg...
Replacement of gas meter on the 1st floor (4050 boston rd.). work includes replacement of gas meter w/ piping, gas test, and gas authorization (blue card) for the utility company. no change in use, eg...
Replace existing RTU units. There is no change in use, occupancy, or egress.
Proposed interior mall retail tenant fit-out for new tenant banana republic. no change to use, egress, or occupancy.
X178 - alterations related to full program accessibility
Proposed interior mall retail tenant fit-out for new tenant banana republic. no change to use, egress, or occupancy.
X178 - alterations related to full program accessibility
Construct new two (2) story community facility building as per plans filed.
Construct new two (2) story community facility building as per plans filed.
It is proposed to combine tenant spaces 306-7 & 308-9 into a single tenant space and to relocate 68 egress corridor on the third floor. zoning use, egress, and occupancy approved under nb#220140274.
It is proposed the plumbing work for the combine tenant spaces 306-7 & 308-9 into a single tenant space on the third floor. zoning use, egress, and occupancy approved under nb#220140274.
It is proposed to combine tenant spaces 306-7 & 308-9 into a single tenant space and to relocate 68 egress corridor on the third floor. zoning use, egress, and occupancy approved under nb#220140274.