Building Permits in ZIP 10475
Bronx, NY — 131 permits filed recently
131 permits
X456 : Earthwork : Removal of Shrubs, Weeds, Grass, Existing Grass Turf, erosion and sediment control, New Grass Turf. ACP-5 Provided Herewith.
Filing for Temporary Fence Installation
Support of Excavation
X456 : Earthwork : Removal of Shrubs, Weeds, Grass, Existing Grass Turf, erosion and sediment control, New Grass Turf. ACP-5 Provided Herewith.
X456 : Athletic Field Upgrade as shown on the Plans filed herewith.
Installation of new mechanical systems, equipment, fixtures, fittings and/or appurtenances, including heating, cooling, and air conditioning systems. no change to use, egress, or occupancy.
Installation of new mechanical systems, equipment, fixtures, fittings and/or appurtenances, including heating, cooling, and air conditioning systems. no change to use, egress, or occupancy.
Filing sprinkler work type in conjunction to the interior fit out of space #5760 (victoria nail salon). no change in use, egress or occupancy.
Filing sprinkler work type in conjunction to the interior fit out of space #5760 (victoria nail salon). no change in use, egress or occupancy.
It is proposed the mechanical work for demising existing retail space #212c inlevel 2 with no change to use, egress, and occupancy.
It is proposed the general construction for demising existing retail space #212c in level 2 with a 1-hour fire rating wall and new rear door for new storage area. no change to use, egress, and occupan...
It is proposed the mechanical work for demising existing retail space #212c inlevel 2 with no change to use, egress, and occupancy.
It is proposed the general construction for demising existing retail space #212c in level 2 with a 1-hour fire rating wall and new rear door for new storage area. no change to use, egress, and occupan...
AT&T - Removal and relocation of telecommunication equipment cabinets in the equipment platform on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
AT&T - Removal and relocation of telecommunication equipment cabinets in the equipment platform on the roof. All work is in compliance with TPPN 5/98. No change in use, egress or occupancy.
Installation of temporary suspended scaffold equipment.
Filing interior renovation to existing store as per plans. No change in use, egress, or occupancy under this application.
Installation of temporary suspended scaffold equipment.
Filing interior renovation to existing store as per plans. No change in use, egress, or occupancy under this application.
Remove & replace roof drains, replace vent flashing, provide new floor drain & piping connection at cellar mech. rm. & provide new catch basin & piping to existing storm drain system line.