Building Permits in ZIP 11102
Queens, NY — 252 permits filed recently
252 permits
Interior demolition. removal of non-load bearing walls. no change in use egress or occupancy under this application
Interior demolition. removal of non-load bearing walls. no change in use egress or occupancy under this application
Herewith filed for an 8' high temporary construction fence to construct a new 5-sty building.
Replace fixtures, & new shower in cellar. relocate fixtures in first floor
Replace fixtures, & new shower in cellar. relocate fixtures in first floor
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
Plumbing specifications filed in conjunction with gc application q01242193-i1
Installation of temporary construction fence as per plans. no change in use, occupancy or egress.
2 story rear extension and general renovation of 2 story building.
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Install temporary construction fence filed in conjunction with New Building job # Q01237492
New building multiple dwelling
Heavy duty sidewalk shed during nb const, filed sep. sidewalk shed shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
2 story rear extension and general renovation of 2 story building.
Install temporary construction fence filed in conjunction with New Building job # Q01237492
New building multiple dwelling
Construction fence as per drawings during nb const, filed sep. construction fence shall comply with ch #33 of the nyc bc. no change in use, occupancy or egress under this application.
Apartment # a4 renovation, replacement of kitchen cabinets, new bathroom tile finishes, all work as per drawings.
Apartment # a4 renovation, replacement of kitchen cabinets, new bathroom tile finishes, all work as per drawings.