Building Permits in ZIP 11103
Queens, NY — 149 permits filed recently
149 permits
Erect illuminated non advertising sign on wall. DUNKIN'- No change of use, egress or occupancy
Existing third floor conversion of existing offices to new day care. no change in other floors. no change in egress.
new installation of sprinkler system
Existing third floor conversion of existing offices to new day care. no change in other floors. no change in egress.
new installation of sprinkler system
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
The purpose of this project is to refurbish existing 1st floor commercial space. no change to egress, occupancy, or use.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or...
Plumbing modifications apartments (1r,1l,2r,2l,3l) as per plans. replacement of sheet-rock through out apartment. --remove and replace floor finishes through out and repair floor as required. replacem...
Relocation of laundry room, installation of kitchen and bathroom fixtures.
plumbing work 1st.fls @ existing commercial establishment.
Plumbing modifications apartments (1r,1l,2r,2l,3l) as per plans. replacement of sheet-rock through out apartment. --remove and replace floor finishes through out and repair floor as required. replacem...
Relocation of laundry room, installation of kitchen and bathroom fixtures.
Install new sprinkler system for 3-story residential building subsequent with a1 dob now#q01211950.no change in use,egress and occupancy.
Install new sprinkler system for 3-story residential building subsequent with a1 dob now#q01211950.no change in use,egress and occupancy.
New dunkin' donuts store on 1st floor of an existing building. replace existing ceiling & floor tiles, lighting fixtures, & wall finishes. install new interior non-load bearing partitions. install new...
New dunkin' donuts store on the 1st floor of an existing building. install new kx hood & ductwork, relocate/resize existing kx hood. install (2) 6-ton rtu. no change in use, egress, or occupancy in co...
New dunkin' donuts store on the 1st floor of an existing building. install new kx hood & ductwork, relocate/resize existing kx hood. install (2) 6-ton rtu. no change in use, egress, or occupancy in co...
New dunkin' donuts store on 1st floor of an existing building. replace existing ceiling & floor tiles, lighting fixtures, & wall finishes. install new interior non-load bearing partitions. install new...
No change in use egress, or occupancy. herewith filed to renovate interior house.