Brooklyn, NY — 607 permits filed recently
607 permits
Subsequent mechanical application filed herewith.
install bench footing and lower the cellar floor
Structural specifications filed in conjunction with GC application #B01314925-I1
Installation of the new concrete pads for mech. equipment in tank rooms and boilerroom. create new opening in the exterior masonry walls. new concrete area ways at tank rooms.
dev hub consultation was done on 10/16/2023 please assign to dev hub, please assign to dev hub team 8 as they reviewed another project on this zoning lot, PROPOSING NEW 4 STORY & CELLAR RESIDENTIAL BU...
Installation of temporary construction fence as per plans filed herewith.
Renovation of cellar mechanical room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
Rear extension at existing floors 3 and 4. filing for the construction of a new penthouse at existing roof level. filing for the interior renovation to all floors no change in use. structural and plum...
dev hub consultation was done on 10/16/2023 please assign to dev hub, please assign to dev hub team 8 as they reviewed another project on this zoning lot, PROPOSING NEW 4 STORY RESIDENTIAL BUILDING.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
dev hub consultation was done on 10/16/2023 please assign to dev hub, please assign to dev hub team 8 as they reviewed another project on this zoning lot, PROPOSING NEW 4 STORY & CELLAR RESIDENTIAL BU...
Foundation and earthwork specifications filed in conjunction with nb application #b01309980-i1.
Application filed herewith for installation of a temporary construction fence
Rear extension at existing floors 3 and 4. filing for the construction of a new penthouse at existing roof level. filing for the interior renovation to all floors no change in use. structural and plum...
Application filed herewith for installation of a temporary construction fence
Installation of temporary construction fence as per plans filed herewith.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Installation of the new concrete pads for mech. equipment in tank rooms and boilerroom. create new opening in the exterior masonry walls. new concrete area ways at tank rooms.
Renovation of cellar mechanical room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
dev hub consultation was done on 10/16/2023 please assign to dev hub, please assign to dev hub team 8 as they reviewed another project on this zoning lot, PROPOSING NEW 4 STORY RESIDENTIAL BUILDING.