Building Permits in ZIP 11205
Brooklyn, NY — 607 permits filed recently
607 permits
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Plumbing and sprinkler filed in conjunction with main application # b00809534
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Plumbing and sprinkler filed in conjunction with main application # b00809534
Installation of pipe scaffolding during new building construction as per plan and in accordance with Chapter 33 of NYC Building Code.
Plumbing and sprinkler filed in conjunction with main application # b00809534
Installation of 300psf sidewalk shed, roof protection and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code no change in use, egress or occupancy under this a...
Installation of pipe scaffolding during new building construction as per plan and in accordance with Chapter 33 of NYC Building Code.
Plumbing application filed herewith in conjunction to nb application # b08004889-i1
Corrective work at 2nd & 3rd floor Class A residential apartments to resolve HPD violations as per plans filed herewith. No change to use, egress, or occupancy under this application
Plumbing application filed herewith in conjunction to nb application # b08004889-i1
Corrective work at 2nd & 3rd floor Class A residential apartments to resolve HPD violations as per plans filed herewith. No change to use, egress, or occupancy under this application
Work to the basement and 1st floor of an existing 2-family, 4-story + attic building. alterations to include the creation of a new stoop & door opening at the front facade to match historic conditions...
Herewith filing support of excavation
Application filed herewith to Combine two dwelling units into one under TPPN 3/97 with NYC DOB Required for Final inspection. PL Work will consist of removal and installation of bathroom, powder rooms...
Application filed herewith to Combine two dwelling units into one under TPPN 3/97 with NYC DOB Required for Final inspection. PL Work will consist of removal and installation of bathroom, powder rooms...
Work to the basement and 1st floor of an existing 2-family, 4-story + attic building. alterations to include the creation of a new stoop & door opening at the front facade to match historic conditions...
Herewith filing support of excavation
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Interior alteration of existing first floor commercial space for new tenant fit out. no change of use, egress or occupancy.subsequent filing b01336738-s1 (pl). modifications to fire suppression to be...