Building Permits in ZIP 11355
Queens, NY — 501 permits filed recently
501 permits
File mh worktype in conjunction with job#q00988198
Horizonal and vertical extension of existing single-family detached residence. obtain new certificate of occupancy.
File mh worktype in conjunction with job#q00988198
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with...
plumbing work as per plans. remove and replace 15 roof drain
Install temporary construction fence.
Install temporary construction fence.
plumbing work as per plans. remove and replace 15 roof drain
Herewith filing alteration-co with horizontal enlargement for existing two story one family residential building. Obtain new certificate of occupancy.
Filing to decommission existing antenna site. Removal of 3 sectors (2 ant/3 RRR per sector) and one equipment platform. Initial installation approved under app #401065976,401369595,420115725,420594798...
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of domestic hot/cold water to service plumbing fixtures through renovated home.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Installation of 300psf sidewalk shed as per plans. sidewalk shed shall comply with chapter # 33 of the nyc code 2022, no changes in use egress or occupancy under this application.
Filing to decommission existing antenna site. Removal of 3 sectors (2 ant/3 RRR per sector) and one equipment platform. Initial installation approved under app #401065976,401369595,420115725,420594798...
Installation of domestic hot/cold water to service plumbing fixtures through renovated home.
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Remove & replace gas fired roof top air handling units, exhaust fans, split ac system , vav boxes with new. new ddc controls & new electric baseboard heaters.
Nypq ep lab #1 cath lab - plumbing modifcations as per plans filed herewith. no change in use, egress, or occupancy.
1. add new concrete footing. 2. add new steel columns and beams from foundation to roof. 3. replace old floor system with new floor system.