Building Permits in ZIP 11356
Queens, NY — 165 permits filed recently
165 permits
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Propose to erect a horizontal extension at an existing two-family house, as per plans submitted herewith. no change in use, occupancy, or means of egress under this application.
HVAC system installation, Contract TI-168 to rehabilitate & upgrade the headworks of the Tallman Island WRRF. Systems comprise of heating & ventilation units, exhaust fans, hot water coils, hydronic p...
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Propose to erect a horizontal extension at an existing two-family house, as per plans submitted herewith. no change in use, occupancy, or means of egress under this application.
HVAC system installation, Contract TI-168 to rehabilitate & upgrade the headworks of the Tallman Island WRRF. Systems comprise of heating & ventilation units, exhaust fans, hot water coils, hydronic p...
New open parking and modifications to building egress.
Application herewith filed for reconstruction & conversion of pre-existing 1.5 story one family building over existing foundation footprint, into a 2.5 story one family building. no change in bulk.
Application herewith filed for reconstruction & conversion of pre-existing 1.5 story one family building over existing foundation footprint, into a 2.5 story one family building. no change in bulk.
Application herewith filed for reconstruction & conversion of pre-existing 1.5 story one family building over existing foundation footprint, into a 2.5 story one family building. no change in bulk.
Propose to remove doctor office from cellar and convert it to acessory use on the 1st floor
Propose to remove doctor office from cellar and convert it to acessory use on the 1st floor
File temporary construction fence.
Install 8' temporary construction fence at the above address
Nb detached 3-story plus cellar 2-family house.
Removed sunroom on the first floor created by previous owner of the building.legalization of construction work in cellar, the first,and the second floor.replace existing windows as per plans.no change...
Removed sunroom on the first floor created by previous owner of the building.legalization of construction work in cellar, the first,and the second floor.replace existing windows as per plans.no change...
File temporary construction fence.
Install 8' temporary construction fence at the above address
sump pump replacement in the Digester building.