Building Permits in ZIP 11356
Queens, NY — 165 permits filed recently
165 permits
installation of solar panels, rooftop, railed, grid-tied, 17 modules, 7.395 KW
Application filing to interior demolish including cleaning and removal of nonbearing partitions at cell, 1st and 2nd floor as per plan. Renovation alteration type 1 job to be filed separately. No chan...
Nb detached 3-story plus cellar 2-family house.
Filed herewith plumbing work type in conjunction with application #q01327566-i1. filed to resolve ecb violation #35475408k.
Installation of construction fence for public protection during construction work.
General structural construction associated with equipment replacement in existing buildings.
Installation of construction fence for public protection during construction work.
General structural construction associated with equipment replacement in existing buildings.
Filed herewith plumbing work type in conjunction with application #q01327566-i1. filed to resolve ecb violation #35475408k.
Installation of sidewalk shed for public protection from areas of construction work. no change in use, egress or occupancy
Subsequent filing for plumbing work install boiler room, kitchen & bathroom, and install sprinklers in basement. no change in use, egress, or occupancy.
General structural construction associated with equipment replacement in existing buildings.
General structural construction associated with equipment replacement in existing buildings.
Installation of sidewalk shed for public protection from areas of construction work. no change in use, egress or occupancy
Subsequent filing for plumbing work install boiler room, kitchen & bathroom, and install sprinklers in basement. no change in use, egress, or occupancy.
Application herewith filed for new 2-story masonry building.
Application herewith filed for change of use for existing one story masonry building and horizontal enlargement.
Application herewith filed for new 2-story masonry building.
Application herewith filed for change of use for existing one story masonry building and horizontal enlargement.
Installation of (1) 8 ton air-cooled split system with ACCU on 2nd floor roof. AHU installed in the 1st floor IT room.