Building Permits in ZIP 11357
Queens, NY — 335 permits filed recently
335 permits
Proposed relocation and installation of new plumbing and gas fixtures for a 2 story one family dwelling with cellar
Mechanical systems associated with boiler replacement.
Removal of existing windows & exterior guards, providenew louvers & exterior guards.prime & paint doors.remove & replace with new concrete pads. new gas meter enclosure . pavement replacement.new meta...
Ps 079q, installation of +/- 8 linear feet sidewalk shed and +/- 270 linear feet chain link fence submitting on behalf of contractor in conjunction with dob # q00634632. no change in use, egress, or o...
Ps 079q, installation of temporary chimney, steam, condensate, and water piping to connect temporary boiler during renovation of main building heating plant in nyc public school in conjunction with do...
Remove & replace concrete pad for equipment. new structural steel boiler access platform and ladder for boilers.
New and relocated plumbing fixtures and associated piping in conjunction with gc application q01187309-i1
Mechanical systems associated with boiler replacement.
Ps 079q, installation of temporary chimney, steam, condensate, and water piping to connect temporary boiler during renovation of main building heating plant in nyc public school in conjunction with do...
Ps 079q, installation of +/- 8 linear feet sidewalk shed and +/- 270 linear feet chain link fence submitting on behalf of contractor in conjunction with dob # q00634632. no change in use, egress, or o...
Removal of existing windows & exterior guards, providenew louvers & exterior guards.prime & paint doors.remove & replace with new concrete pads. new gas meter enclosure . pavement replacement.new meta...
Proposed relocation and installation of new plumbing and gas fixtures for a 2 story one family dwelling with cellar
Horizontal enlargement to existing 1 family, 1 story + cellar building. interior gut renovation. new partitions, finishes, doors, windows, and cabinetry as per plans
Installation of structural work involved in partial demo as per the plans filed herewith. no change in use, occupancy or egress.
Installation of structural work involved in partial demo as per the plans filed herewith. no change in use, occupancy or egress.
Proposed to extend existing mezzanine A & change it to Second fl, and change use to community facility at commercial side of Bldg. Existing property has 2 semi attached bldgs, One residential an the o...
Installation of solar panels on roof. no change in use, egress, or occupancy.
Proposed vertical and horizontal to existing two story and cellar, one-family dwelling. interior renovation. new partitions, finishes, doors, windows, kitchen cabinets, and new hvac as per plan
Proposed to extend existing mezzanine A & change it to Second fl, and change use to community facility at commercial side of Bldg. Existing property has 2 semi attached bldgs, One residential an the o...
Installation of solar panels on roof. no change in use, egress, or occupancy.