Building Permits in ZIP 11360
Queens, NY — 142 permits filed recently
142 permits
Install temporary construction fence.
Herewith filing New 5-story School Building Q388
Herewith filing New 5-story School Building Q388
Outriggers system installation for facade inspection and repairs repairs. no change in use egress or occupancy.
Outriggers system installation for facade inspection and repairs repairs. no change in use egress or occupancy.
Plumbing work in conjunction with tenant fit out
Plumbing work in conjunction with tenant fit out
'ps-284 clearview pump station reconstruction includes construction of a new building envelope to house new electrical and mechanical equipment and site restoration.
Ps-284 clearview pump station reconstruction structural work includes concrete and roofing work associated with a new above grade pump station building, plus full below grade restoratoin of the exisit...
Ps-284 clearview pump station reconstruction hvac work includes new hvac equipment (exhaust fans, supply fans, associated ducting, air conditioning , and unit heaters) for new above grade pump station...
Ps-284 clearview pump station reconstruction foundation work includes concrete work associated with construction of a new above grade pump station building, plus full below grade restoratoin of the ex...
Soe work related to the sewer trenches for the nb clearview water pump station. soe to involve timber lagging and steel&timber wales/braces. all soe work will be performed within the project site and...
Interior non-structural alteration of unit 2h. replacement of fixtures, finishes, and lighting. no change in use, occupancy or egress.
Ps-284 clearview pump station reconstruction foundation work includes concrete work associated with construction of a new above grade pump station building, plus full below grade restoratoin of the ex...
'ps-284 clearview pump station reconstruction includes construction of a new building envelope to house new electrical and mechanical equipment and site restoration.
Ps-284 clearview pump station reconstruction structural work includes concrete and roofing work associated with a new above grade pump station building, plus full below grade restoratoin of the exisit...
Ps-284 clearview pump station reconstruction hvac work includes new hvac equipment (exhaust fans, supply fans, associated ducting, air conditioning , and unit heaters) for new above grade pump station...
Interior non-structural alteration of unit 2h. replacement of fixtures, finishes, and lighting. no change in use, occupancy or egress.
Soe work related to the sewer trenches for the nb clearview water pump station. soe to involve timber lagging and steel&timber wales/braces. all soe work will be performed within the project site and...
Installation of temporary construction fence to accomodate associated new building # q00643658.