Proposed mechanical work only on 1st floor existing commercial store as per plan. no change in use, egress and occupancy.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 91st street entrance and all around the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is in front of the building at 80th street elevation.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 92nd street entrance and all around the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed in front of the building at 81st street elevation.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is front of the building, 81st street and 34th avenue elevations.
Installation of temporary sidewalk shed as per plan. no change in use, egress, or occupancy. the sidewalk shed at 92nd street entrance and all around the building.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is at 80th street elevation.
Subsequent filing for removing plumbing fixtures in the cellar to correction ECB violation 35676086H. No change to the use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removing partition walls and bathroom in the cellar, remove brick fence and re-install chainlink fence in the front yard. to correct ECB violation 35676086H & 35228040N. No change to the use, egress o...
Replacing existing roof top (split system) unit with new as per plans filed herewith.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is in front of the building at 81st street elevation,
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removing partition walls and bathroom in the cellar, remove brick fence and re-install chainlink fence in the front yard. to correct ECB violation 35676086H & 35228040N. No change to the use, egress o...
Installation of temporary sidewalk shed as per plan. there is no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plan. there is no change in use, egress, or occupancy. the sidewalk shed is in front of the building at 81st street elevation,
Replacing existing roof top (split system) unit with new as per plans filed herewith.