Building Permits in ZIP 11373
Queens, NY — 300 permits filed recently
300 permits
Install 8' temporary construction fence at the above address
Install 8' temporary construction fence at the above address
Hand demolition of existing frame garage
Filing for sidewalk shed. No change in use, egress or occupancy.
Mechanical modifications and associated duct pipping (Tony's Tacos) as indicated on plans. No change in use egress or occupancy.
Filing for sidewalk shed. No change in use, egress or occupancy.
Mechanical modifications and associated duct pipping (Tony's Tacos) as indicated on plans. No change in use egress or occupancy.
THIS APPLICATION FILE TO REMOVE VOLATION restore GENERAL CONSTRUCTION CARPENTRY WORK to prior condition to resolve violation 39153081L. RESTORE SITE TO 2004 APPROVED DRAWINGS
THIS APPLICATION FILE TO REMOVE VOLATION restore GENERAL CONSTRUCTION CARPENTRY WORK to prior condition to resolve violation 39153081L. RESTORE SITE TO 2004 APPROVED DRAWINGS
All exposed steel to be re-encased in concrete, or finish provided. remove all loose concrete down to sound concrete at deteriorated foundation walls, courtyard slab to be removed and replaced with 4...
Temporary shoring for parking garage repairs
Removal of equipment and piping including but not limited to fuel oil tank, fuel oil pumps, fuel oil piping and fuel oil control panels.
Waterproofing at interior side of cellar foundation walls, patch/repair of failing/cracking concrete slabs, beam encasements, column encasements and walls, replacement of roof system with new roofing.
Remove existing concrete pavement and subbase. placement of new concrete pavement.
Install 8' construction fence at above address.
Remove existing concrete pavement and subbase. placement of new concrete pavement.
Temporary shoring for parking garage repairs
Install 8' construction fence at above address.
Waterproofing at interior side of cellar foundation walls, patch/repair of failing/cracking concrete slabs, beam encasements, column encasements and walls, replacement of roof system with new roofing.
Removal of equipment and piping including but not limited to fuel oil tank, fuel oil pumps, fuel oil piping and fuel oil control panels.