Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Install plumbing fixtures on 1st, 2nd, 3rd floor and cellar. cap and remove toilet, lavatory on 2nd & 3rd floor. install 9 sprinkler heads on 1st floor in conjunction with b01311337-i1.
Install plumbing fixtures on 1st, 2nd, 3rd floor and cellar. cap and remove toilet, lavatory on 2nd & 3rd floor. install 9 sprinkler heads on 1st floor in conjunction with b01311337-i1.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Removal of (3) tanks, installation of(2) new 12,000 gallon tanks, and 4 new mpd with associate piping
File pl worktype in conjunction with nb job#q00715882
Removal of (3) tanks, installation of(2) new 12,000 gallon tanks, and 4 new mpd with associate piping
File pl worktype in conjunction with nb job#q00715882
Filed herewith subsequent filing for Foundation work only. Filed in conjunction with NB #Q01047345.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Filed herewith subsequent filing for Foundation work only. Filed in conjunction with NB #Q01047345.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Provide new sleeves and link seal fittings at water service piping sanitary piping and fresh air intake piping as shown on drawings remove and reinstall piping as shown on drawings for concrete waterp...
Alteration of existing building to replace roofing systems, parapet walls, windows, and louvers; remove and replace interior doors and partitions. No change in use, egress, or occupancy.
Provide link seal fittings in existing sprinkler water service piping penetrations
Installation of a temporary needle beams as per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Repair eroded Metal Deck at the cellar. No change in use, egress, or occupancy.
Provide new sleeves and link seal fittings at water service piping sanitary piping and fresh air intake piping as shown on drawings remove and reinstall piping as shown on drawings for concrete waterp...
Repair eroded Metal Deck at the cellar. No change in use, egress, or occupancy.
Alteration of existing building to replace roofing systems, parapet walls, windows, and louvers; remove and replace interior doors and partitions. No change in use, egress, or occupancy.