Building Permits in ZIP 11379
Queens, NY — 151 permits filed recently
151 permits
Install new hvac 5 tn mini split unit for a first floor commercial space and (2) hvac mini split units for exist (2) apartments at second floor.
Install temporary non-illuminated ground sign (burlington)
Wood construction fence
Minor partition modifications and new rolldown gate
Minor partition modifications and new rolldown gate
Wood construction fence
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. live load 300psf.
Roof drain replacement
Replace brick with new brick on front facade and new lintels above openings,.
Replace brick with new brick on front facade and new lintels above openings,.
Roof drain replacement
Install electric hvac units for 1 family dwelling with associated ducts as per plans.
Partial proposed interior partitions work at cellar and cellar mezzanine floors. application filed under 1968 building code. separate filing alt 1 q01083155-i1.
Install electric hvac units for 1 family dwelling with associated ducts as per plans.
Partial proposed interior partitions work at cellar and cellar mezzanine floors. application filed under 1968 building code. separate filing alt 1 q01083155-i1.
Propose a new three story with three family dwelling units. obtain new c of o.
Replace kitchen and bathroom fixtures and replace 1 existing gas meter in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.