Building Permits in ZIP 11385
Queens, NY — 343 permits filed recently
343 permits
Interior renovation of apartment #1 and #2 at first floor as per plans submitted. this application does not constitute changes in floor area, use and occupancy.
Modify (1) toilet, (1) lav, (1) shower, (2) sinks, (1) washer, (1) gas dryer, (1) hot water heater, (1) boiler
filing for the installation of new gas piping for gas fire hot water heater and equipment as shown in the plans. no change of use, egress or occupancy under this application.
Application filed for temporary construction fence in conjuction with application #
Modification to ex plumbing system as per dwgs. new drains at roof to ex leaders. installation of new on-site drywells for stormwater from ex bldg, incl trench & floor drains, piping/connection. remov...
Modification to ex plumbing system as per dwgs. new drains at roof to ex leaders. installation of new on-site drywells for stormwater from ex bldg, incl trench & floor drains, piping/connection. remov...
filing for the installation of new gas piping for gas fire hot water heater and equipment as shown in the plans. no change of use, egress or occupancy under this application.
Installation of Temporary Shoring & Bracing to comply with OP-32 Immediate Emergency DEC# 19894
Altering existing restaurant kitchen plumbing & gas supply piping to accommodate new gas cooking appliances & equipment. Installing new plumbing and required exhaust venting for new accessible restroo...
Interior renovation and replace exterior doors and windows of existing basement, and rear open deck entrance to first floor, no change in use, egress or occupancy.
P.S. 245-Q: Sensory Space conversion including new athletic resilient flooring, acoustic ceiling, tile ceiling with new lighting fixtures, new paint finish for interior walls and door frame.
P.S. 245-Q: Sensory Space conversion including new athletic resilient flooring, acoustic ceiling, tile ceiling with new lighting fixtures, new paint finish for interior walls and door frame.
Interior renovation and replace exterior doors and windows of existing basement, and rear open deck entrance to first floor, no change in use, egress or occupancy.
Altering existing restaurant kitchen plumbing & gas supply piping to accommodate new gas cooking appliances & equipment. Installing new plumbing and required exhaust venting for new accessible restroo...
Installation of Temporary Shoring & Bracing to comply with OP-32 Immediate Emergency DEC# 19894
Filing plumbing work in conjunction with dob job number q01231990, plumbing and gas work as per plan. no change in use, egress or occupancy.
Filing plumbing work in conjunction with dob job number q01231990, plumbing and gas work as per plan. no change in use, egress or occupancy.
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Application #Q01345112-I1
Filed Herewith; 8-Foot-High Temporary Plywood Construction Fence in conjunction with Application #Q01345112-I1
Plumbing work associated w/interior renovation of exg. 1-fam house including new and modified gas, storm, water/sanitary piping, and installation of (1) new direct vent condensing boiler for heating a...