Building Permits in ZIP 11432
Queens, NY — 358 permits filed recently
358 permits
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Installation of temporary fence for NYCDEP Contract # GI-CONS-3
Proposed new 13-story mixed-use building. ulurp certified zoning special permit #c230262zsq, ulurp referred zoning text amendment #n230263zrq
New mechanical system on 1st floor commercial space. work will include the installation of a new exhaust hood, new ducts up to the roof, a split dx air conditioner, and an exhaust fan as per plan. no...
New mechanical system on 1st floor commercial space. work will include the installation of a new exhaust hood, new ducts up to the roof, a split dx air conditioner, and an exhaust fan as per plan. no...
Proposed installation of pipe scaffold for remedial repairs as per plans. no change in use occupancy or egress under this application.
Installation of temporary fence for NYCDEP Contract # GI-CONS-3
Proposed 4 family 2 story and cellar residential and commercial mixed use building. proposed 2 story horizontal extension. increase in bulk and far to comply with new building regulations
Partial restoration of existing curb cut to leave maximum 15 feet curb cut as per zr 25-634.
Demolition of Building Up to Cellar Floor.
Subsequent fence application in conjunction with approved gc #q01011752-i1
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils a...
Structural application in conjunction with gc #q01011752-i1
Subsequent support of excavation application in conjunction with gc #q01011752-i1
Subsequent fence application in conjunction with approved gc #q01011752-i1
Subsequent support of excavation application in conjunction with gc #q01011752-i1
Structural application in conjunction with gc #q01011752-i1
Proposed 4 family 2 story and cellar residential and commercial mixed use building. proposed 2 story horizontal extension. increase in bulk and far to comply with new building regulations
P.S. 95-Q: Addition of refrigerant piping, split system air-cooled heat pump systems, rooftop mounted air source heat pump units, mechanical and natural smoke purge, ductwork, electric heating coils a...
Demolition of Building Up to Cellar Floor.