Building Permits in ZIP 11434
Queens, NY — 282 permits filed recently
282 permits
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Filing minor interior renovation to Pharmacy and counter area as per plans. No change in use, egress, or occupancy under this application.
Filing minor interior renovation to Pharmacy and counter area as per plans. No change in use, egress, or occupancy under this application.
Provide and install new heating, ventilation , cooling (hvac) system for first floor in existing offices building as per submitted mechanical plans. no change in use or egress or cooupancy.
Party wall-tie back and water proofing / parging at exposure 4, in-conjunction with full demo of adjacent lot
Installation of new non-emergency gas generator on the roof. No change in use, egress or occupancy.
Installation of new VERIZON site on the roof. Install 3 sectors (12 antennas) with associated parts, 6 RRH units, 3 OVP's, 3 GPS antennas and 1 equipment platform with cabinets. Related conduits throu...
installation of solar panels, rooftop, railed, grid-tied, 51 modules, 20.91 KW
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
installation of solar panels, rooftop, railed, grid-tied, 51 modules, 20.91 KW
Installation of solar panels,rooftop,railed, grid-tied, 22 modules, 9.02kw
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Room renovations - Multimedia room 219 and 223 along with ceiling patchwork in rooms 115 and 116
Handheld full demolition of an existing two-story two-family frame building as per plans.
Installation of solar panels, rooftop, grid tied, railed, 28 modules, 11.48 KW
Installation of solar panels, rooftop, grid tied, railed, 28 modules, 11.48 KW
Room renovations - Multimedia room 219 and 223 along with ceiling patchwork in rooms 115 and 116
Handheld full demolition of an existing two-story two-family frame building as per plans.
Install new wood construction fence as per drawings.
The scope of the work includes the installation of the supplemental cooling systems for the girls gymnasium.