Building Permits in ZIP 11436
Queens, NY — 118 permits filed recently
118 permits
Sh/ps123q - for temporary construction equipment(shed) submitting on behalf of contractor, related to dob # q00670498, q00888955, q00894443 no change in use, occupancy or egress
Proposed canopy
Proposed canopy
Proposed canopy
Proposed (3) 10,000 gal. regular, diesel & super tanks, existing (6) multi-product dispensers with associated piping
Proposed (3) 10,000 gal. regular, diesel & super tanks, existing (6) multi-product dispensers with associated piping
Proposed (3) 10,000 gal. regular, diesel & super tanks, existing (6) multi-product dispensers with associated piping
Plumbing work for fire restoration of a 1-family home to remove and replace plumbing fixtures and related piping. No change in use, egress, or occupancy.
Proposed (3) 10,000 gal. regular, diesel & super tanks, existing (6) multi-product dispensers with associated piping
Plumbing work for fire restoration of a 1-family home to remove and replace plumbing fixtures and related piping. No change in use, egress, or occupancy.
Hereby filing fof new sprinkler and standpipe system for new building#q00487394
Hereby filing fof new sprinkler and standpipe system for new building#q00487394
Hereby filing fof new sprinkler and standpipe system for new building#q00487394
Installation of 21.12 kw solar energy system on roof. No change of occupancy, use or egress.
Full interior gut renovation with all new non-load bearing partitions, doors, sheetrock, bathrooms, kitchens and finishes on 1st and 2nd floors. new bathroom and boiler rm in cellar. existing structur...
PROPOSED: NEW 2nd FLOOR EXTENSION AND GENERAL RENOVATION
Installation of 7.04 kw solar energy system on roof. No change of occupancy, use or egress.
Installation of 6.16 kw solar energy system on roof. No change of occupancy, use or egress.
PROPOSED: NEW 2nd FLOOR EXTENSION AND GENERAL RENOVATION
Full interior gut renovation with all new non-load bearing partitions, doors, sheetrock, bathrooms, kitchens and finishes on 1st and 2nd floors. new bathroom and boiler rm in cellar. existing structur...