Building Permits in ZIP 19146
Philadelphia, PA — 508 permits filed recently
508 permits
Change of Use - Limited Lodging
Alterations - REPAIR/REPLACE CT, FAI & MD IF NECESSARY.
Make Safe Permit For RP - FOR THE REPLACEMENT OF THE FRONT WALL TO RESOLVE CASE 711330. ALL WORK TO BE DONE PER APPROVED PLANS AND ENGINEERING INSPECTION LETTER. IF FIELD CONDITIONS VARY CONTACT DESIG...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
EZ Interior Non-Load-Bearing Wall Demo. - EZ INTERIOR DEMOLITION- For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards requi...
Addition and/or Alteration - Single family home - rehab. Existing 100AMP service is already in place. New 30 ct main breaker panel. Wiring throughout by 2017 NEC.
Change of Use - Visitor Accommodations
Excavation - Site / Utility Permit for RP-2025-012265
New Construction - FOR INSTALLATION OF A TWO-INCH FIRE SERVICE LINE, TWO-INCH BACKFLOW PREVENTER AND FIRE SPRINKLER SYSTEM IN ACCORDANCE WITH APPROVED PLANS, HYDRAULIC CALCULATIONS AND NFPA 13R.
EZ Roof Covering Replacement - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the at...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
Addition and/or Alteration - Interior Alterations of existing two story single family dwelling with basement. Details as shwon on the plan.
Alterations - REPAIR/REPLACE 3/4" WDP.
Alterations - Replace house trap and fresh air inlet.
Addition and/or Alteration - Wire through out as per 2017 nec Install 100 amp service as per 2017 nec Including grounding and bonding
Addition and/or Alteration - FOR LEVEL II ALTERATIONS TO AN EXISTING RELIGIOUS ASSEMBLYE BUILDING, ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS AND ACCESSIBILIT...
EZ Interior Non-Load-Bearing Wall Demo. - For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards,...
Alterations - Curb trap, fresh air inlet & main drain.
Minor Demolition - FOR THE COMPLETE DEMOLITION OF THE ATTACHED TWO-STORY STRUCTURE BY HAND AND HAND HOLD DEVICES. PEDESTRIAN PROTECTION TO BE IN PLACE PRIOR TO START OF WORK AND TO BE MAINTAINED DURIN...
Alterations - REPLACE PIPING & 9 FIXTURES for: 1 kitchen, 1 laundry, 2 full bathrooms & 1 water heater.