Building Permits in ZIP 19147
Philadelphia, PA — 361 permits filed recently
361 permits
Addition and/or Alteration - For the erection of a third floor addition and for interior and exterior alterations to an existing attached single-family dwelling per plans. Separate permits are require...
Addition and/or Alteration - Installation of a 7.650 kW solar system, consisting of (17) SIRUS ELNSM54M-HC-N450W and (17) ENPHASE IQ8HC-72-M-DOM-US (240V)INVERTER AS PER 2017 NEC. In Accordance with a...
Addition and/or Alteration - FOR INTERIOR ALTERATION AND RENOVATION WITH THE ADDITION ON THE THIRD STORY REAR OF AN EXISTING THREE (3) STORY RESIDENTIAL STRUCTURE AS PER APPROVED PLAN. ** PHC STAFF RE...
Signs (Accessory / Non-Accessory) - FOR ERECTION OF ONE (1) NON-ILLUMINATED ACCESSORY PROJECTING SIGN DOUBLE FACED ON EXISTING STRUCTURE. SIZE AND LOCATION AS SHOWN ON THE APPLICATION / PLAN.
Foundation - FOR THE CONSTRUCTION OF FOUNDATION AS PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WO...
Alterations - REPLACE 4 FIXTURES IN 1 Bath & 1 Kitchen.
New construction, addition, GFA change - For the erection of an attached structure (not to exceed 45 ft. in height (7 ft. earned from Mixed Income Housing bonus)), that includes a common roof deck wit...
New construction, addition, GFA change - FOR THE ERECTION OF THREE STORY REAR ADDITION AND ERECTION OF ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE ALL AS PART OF AN EXIST...
Addition and/or Alteration - FOR INTERIOR ALTERATIONS TO AN EXISTING SINGLE-FAMILY STRUCTURE AS PER APPROVED PLAN. *SEPARATE PERMITS REQUIRED FOR ELECTRICAL, PLUMBING, AND MECHANICAL WORK*
New Construction - Mechanical / Fuel Gas Permit for combo RP-2024-002112
Alterations - REPAIR/REPLACE 3/4" BACKFLOW DEVICE
Change of Use - Residential - Household Living - Single-Family
Change of Use - Eating and Drinking Establishments - Sit-Down Restaurant
New construction, addition, GFA change - For the erection of an addition to an existing attached structure. Size and location as shown in plans.
Change of Use - Residential - Household Living - Multi-Family
Alterations - REPAIR/REPLACE CT & FAI.
Alterations - REPAIR/REPLACE CT, FAI & MD.
Addition and/or Alteration - INTERIOR ALTERATION TO EXTEND THE EXISTING DAY CARE USE ON THE 3RD FLOOR OF AN EXISTNG STRUCTURE. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT...
Alterations - REPAIR/REPLACE CT, FAI, MD & 3/4" WDP.
EZ Interior Non-Load-Bearing Wall Demo. - EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attached standard. Deviatio...