Building Permits in ZIP 19148
Philadelphia, PA — 492 permits filed recently
492 permits
Addition and/or Alterations - EZ KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require su...
Alterations - Replace 5" curb trap with fresh air inlet.
Alterations - REPAIR/REPLACE CT, FAI & MD FROM TRAP TO FOUNDATION WALL.
Addition and/or Alteration - STATEMENT OF WORK: FIBER CABLING: • Provide labor to install 288-strand singlemode non-armored ribbon fiber optic cable from the Head End to Comm Rooms 3.12.04, 3.37.03, 5...
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations...
New Construction or Additions - Install 11 FIXTURES TO 2 full bathrooms, 1 half bathrooms, 1 hot water heater, 1 kitchen sink & 1 laundry.
Addition and/or Alteration - FOR PARTIAL DEMOLITION AT THE SIDE; FOR THE ELEVEL II INTERIOR ALTERATIONS AND EXTERIOR ALTERATIONS FOR THE USE OF (A2 OCCUPANCY) SIT- DOWN RESTAURANT IN AN EXISTING BUILD...
Addition and/or Alteration - INTERIOR ALTERATION TO THE FIRST FLOOR OF EXISTING STRCURE TO CREATE NEW COMMERCIAL SPACE (SPACE 1C) AND NEW LOBBY AREA. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD C...
Addition and/or Alteration - - For alterations to an Existing One Family Dwelling as per attached standard. Deviations from this standard will result in permit revocation and require submission of con...
Addition and/or Alteration - Total Rewire per NEC 2017, Existing 200 Amp Service (single family)
Alterations - Repair / replace 3/4" water service
Temporary Tents and Canopies - TENTS FOR POLAR PLUNGE AS PER PLAN AND PHILADELPHIA FIRE CODE. NO ENCROACHMENT IN THE PUBLIC RIGHT of WAY. STAGE IS NOT PART OF THIS PERMIT. ELECTRICAL PERMIT REQUIRED,...
Addition and/or Alteration - Supply and install (1) 70A circuit breaker, (1) 45 KVA transformer, (1) 100A panelboard, and (25) receptacle outlets for office fit out as per 2017 NEC. All lighting is ex...
Addition and/or Alteration - Install all new wiring and devices throughout. Install new 200 amp service including 200 amp Meter & Panel in accordance with NEC 2017
Alterations - INSTALL 14 FIXTURES 3 full bathrooms, 1 half bathroom, 1 kitchen sink, 1 dishwasher, 1 laundry & 1 hot water heater.
Addition and/or Alteration - Total rewire per NEC 2017, 200 AMP service (single family)
Alterations - French drain (the pit is located OUTSIDE the bathroom - the french drain is running alongside a basement bathroom which is located on the exterior wall of the basement) moving a vanity 6...
Alterations - 3/4 water service replacement
Change of Use - Limited Lodging
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviation...