Building Permits in ZIP 78726
Austin, TX — 107 permits filed recently
107 permits
NEW DRIVEWAY AND Detached GARAGE WITH 2ND FLOOR GAME DEN.
Replacement of an existing water heater 50 gallon natural gas water heater change out 11105 Calavar Drive Austin TX 78726
Interior Kitchen remodel and breakfast Nook addition. Enclose existing covered patio (concrete slab and pergola already in place) with new walls and roof. . Install new electrical circuits. Replace th...
Sign E08 - Curbside Logo and HEB capsule - 11521 FM 620
Sign E09 - Curbside Logo and Capsule - 11521 N FM 620
New construction of 2 story SFR 5 bed 5.5 bath with attached garage
E10 HEB Curbside Logo - 115211 FM 620
Pool - Installation of an in-ground pool with a new concrete deck spa water pool & spa coping and equipment pad.
New construction of in ground pool and spa with concrete decking and equipment pad
Interior Kitchen remodel and breakfast Nook addition. Enclose existing covered patio (concrete slab and pergola already in place) with new walls and roof. . Install new electrical circuits. Replace th...
ePlan: Residential Expedited Review - New accessory structure. Existing primary dwelling to remain. New construction of a 1-Story Guest House [2bed 1bath] with Attached Garage.
ePlan: Residential Expedited Review - New accessory structure. Existing primary dwelling to remain. New construction of a 1-Story Guest House [2bed 1bath] with Attached Garage.
7 DAY - Interior remodel of existing office space. splitting one suite into two (100 and 115) with a common corridor (FLR1)
Replacement of complete existing central heat and air system with or without duct work change out - 4 ton 15 seer gas system
7 DAY - Interior remodel of existing office space. splitting one suite into two (100 and 115) with a common corridor (FLR1)
BETTER BUILDER PROGRAM. SE COSMOS LLC HAS NOT MET BETTER BUILDERS AGREEMENT; EMAIL SENT 3/27/26 (CP) ePlan: Commercial Expedited Review - Interior Remodel of Sector 3- Level 1- Shipping Sector 7- Floo...
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System (Unit #17)
new construction of 3 story wood frame hotel
ePlan: Commercial Expedited Review - Interior Remodel of Existing Admin Areas Phase 2.
Replacement of an existing water heater