Building Permits in ZIP 78745
Austin, TX — 744 permits filed recently
744 permits
Total demo of SFR 1048 sq ft circa 1962 ***The building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in Steps 5 & 6 of the Demolitio...
Express: Replace shower with roll-in shower install new diverter valve and piping replace existing vanity install faucet install new trap drain supply lines valves remove and replace flooring replace...
Express: Foundation repair
Express: Replacing windows size for size new siding Upgrade finishes and fixtures in bathrooms and kitchen.
Express: Replacing windows size for size new siding Upgrade finishes and fixtures in bathrooms and kitchen.
ePlan: Residential Expedited Review - New construction of a 3-Story Duplex [3bed 2.5bath] with attached Carport and Autofill Pool. 4411 Mount Vernon Dr Unit A
running unground feed to shed and wiring up shed to code 12x16 Shed
New construction of a 2-story single family dwelling in a condo regime. 4 BEDROOM 3.5 BATH ATTACHED GARAGE Revision 1: The building footprint and floor plan for this lot have been revised. The updated...
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 3.5bath] with Attached Garage.
Express: Replace 12 windows and 1 door (like for like)
Construct 2 new driveway approaches of 50 FT(25 Each) and sidewalk of 680 LF and curb & gutter of 346 FT. SP-2022-0157C 2024 031407 000 00 SSI
EXPRESS: Refoof project tear down to decking and replace with architectural shingle
Irrigation unit #1
Total demo of sfr 1056 sqft circa 1985
ePlan: Residential Expedited Review - New construction of a 1-Story Single Family Res. [1bed 1bath]. Bldg 2
Replacement of HVAC System
Main Service Replacement
service loop upgrade 100-200amp
New construction of a 2-story single family dwelling in a condo regime. 3 Bedroom 2.5 bath 2 car attached garage
ePlan: Commercial Expedited Review - [CONCURRENT] Change of Use and Finish Out for Theater and Dance School in Space Previously Retuned to Shell in Phase I scope includes New Exterior Openings for Gla...