Building Permits in ZIP 90003
Los Angeles, CA — 104 permits filed recently
104 permits
New 3-story duplex with attached garage(bld c). fully sprinklered.
New 3 story duplex with attached adu ground floor and garage(bldg d). fully sprinklered.
ORDER TO COMPLY ISSUED: 05/07/2009INSPECTOR: FELIPE PENICHE PHONE: 2137631177Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___22___Squares. Cl...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 50 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
**eplan****: NEW WAREHOUSE WITH MEZZANINE. CORE AND SHELL ONLY, TENANT IMPREVEMENT WILL BE UNDER A SEPARATE PERMIT.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
COMPLY WITH DEPARTMENT ORDER effective date11/08/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATENEW 2 DETACHED 2 STORIES ADUS Per GC 66323(3)(4)
COMPLY WITH DEPARTMENT ORDER effective date11/08/2024. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE.demolition of (e) 2-car garage
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 15 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Concrete block freestanding masonry fence walls constructed per Information Bulletin P/BC 2020-096 located in residential zones, maximum 6 feet height above grade, and not located in the required fron...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 16 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___35___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VH...
"COMPLY WITH DEPARTMENT ORDER effective date 11/19/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Kitchen/bathroom (1) remodel for residential buildings (no structural changes).
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing 12 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zo...
ePlan. Conversion of (E) Attached Garage to ADU per ." COMPLY WITH DEPARTMENT ORDER effective date 10/15/2025. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
ePLANNEW DETATCHED ADU PER LAMC 12.22 A.33(b)(1),(c),(d),(h) and (k)
PROPOSED 1-STORY 22'-6" X 32' A.D.U. PER GCS 66323(a)(2) AT REAR OF LOT.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 25 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Supplemental to 25014-30000-02889 to provide correct structural sheets for attached ADUCOMPLY WITH DEPARTMENT ORDER effective date 04/15/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE. CEIS Case...
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing 15 Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHS...