Building Permits in ZIP 90007
Los Angeles, CA — 82 permits filed recently
82 permits
REMODEL AND ADDITION TO (E) 2-STORY SFD TO CREATE A (N) ATTACHED 2-STORY ACCESSORY DWELLING UNIT TO COMPLY WITH LAMC 12.22 A.33 (c) and (e) PER ENGINEERING
ePlan. DEMO 2-STORY DUPLEX
ePlan. DEMO DETACHED GARAGE
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing __25__Squares. Class A roof covering is required within Very High Fire Hazard Sev...
Eplan Convert (E) detached Garage with addition into a new ADU per GCS 66323(a)(2)
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (9) Squares. Class A roof covering is required within Very High Fire Hazard Severity Z...
New trash enclosure w/ canopy
New 5 story 7 units + 1 adu (14% vli = 1) affordable housing apartment to include 4 story type va apartment over 1 story type ia parking/lobby, tier 3 toc with additional incentive
Grading work for the New 7 unit+1 ADU Affordable Housing
(1) Kitchen/ (1) bathroom remodel for residential buildings (no structural changes).
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 13 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Foundation replacement per la city standard plan #1. pier and posts & sistered foundation per engineer.
Alterations to wireless telecom site for - SAFETY REMEDIATION - INSTALL PROPOSED CONTROL LINES AND FLAGS FOR DESIGNATED ACCESS PATH, INSTALL (1) PROPOSED STEP UP-AND-OVER, INSTALL (1) PROPOSED SELF-CL...
ePlan. equipement anchorage. Replace an existing outdoor 100KW Generator outdoor with a new 180KW Generator in the same area but different orientation, including new concrete pad, new conduit and powe...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. overexisting solid sheathing (185 ) Squares. Class A roof covering is required within Very High FireHazard Seve...
ePlan. Demo (e) 1-story SFD and carport
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).
Supplemental to 25016-10000-04626 to include additional foundation replacement with A,B method. (E) exterior wall shall remain.
Backfill of equipment pit.
Supplemental permit to 24016-10000-25775 to remove fire sprinkler from structural inventory. Removed the square footage of the dining area and converted them into the kitchen storage (back of house) a...