Building Permits in ZIP 90015
Los Angeles, CA — 57 permits filed recently
57 permits
Eplan Supplemental to Permit # 24014-20000-05359 : Deferred submittal for installation of foundations with micro piles .
Eplan Supplemental to Permit # 24014-20000-05363 : Deferred submittal for installation of foundations with micro piles .
Reframe, repair the landing at the front of unit 7.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing (10 ) Squares. Class A roof covering is required within Very High Fire Hazard Sev...
Bathroom remodel to (e) condo multi-family. no structural work.
Demo (e) two story retail building. sewer cap required.
Supplemental permit to permit #23016-10000-42117 to: change the contractor information to read "total construction"
Application of an approved coating to an existing exterior balcony or deck.
EPLAN Proposed Tenant Improvement consisting of a build out of interior spaces. Including floor finishes, walls, , ceiling, toilet rooms, millwork and all related finishes. 3 OF 6
EPLAN Proposed Tenant Improvement, consisting of a build out of interior spaces. Including floor finishes, walls, ceiling, toilet rooms, millwork and all related finishes6 OF 6
EPLAN Proposed Tenant Improvement consisting of a build out of interior spaces. Including floor finishes, walls, ceiling, toilet rooms, millwork and all related finishes. No change of use or occupancy...
EPLAN***Supplemental permit for installation of (N) fixed ladder***"COMPLY WITH DEPARTMENT ORDER effective date09/15/2023. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
EPLAN Proposed Tenant Improvement consisting of a build out of interior spaces. Including floor finishes, walls, ceiling, toilet rooms, millwork and all related finishes5 OF 6
EPLAN Proposed Tenant Improvement consisting of a build out of interior spaces. Including floor finishes, walls, ceiling, toilet rooms, millwork and all related finishes. 2 of 6
EPLAN Proposed Tenant Improvements consisting of a build out of interior spaces. Including floor finishes, walls, ceiling, toilet rooms, millwork and all related finishes. 4 OF 6
EplanMethane plans (Level I) for the Los Angeles Convention Center
EPLAN. Supplemental to 22016-10001-36689 ADA access door system