Building Permits in ZIP 90066
Los Angeles, CA — 331 permits filed recently
331 permits
Adding a new bathroom and laundry room within existing single family dwelling and adding exterior new doors and windows
Capture of the linkage fee and termination of the covenant and agreement.
EPLANNEW Swimming Pool with Spa PER ENGINEER DESIGN
Remove (e) 1695 sf sfd except for 2' of wall and foundation. rebuild 51' x 66'-5" irregular shaped 2-story w/ 2-car garage. nfpa 13d fire sprinklers throughout. all work per engineering.
New 20'x 24' detached 1-story accessory dwelling unit. nfpa 13d fire sprinklers throughout.all work per engineering.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 17 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Install radiant barrier and/or insulation in attic for residential buildings.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 20 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Propose 14'-11"x17'-11" bedroom addition to (e) rear unit of (e) duplex, add 14'-11"x14'-11" recreation room above with (n) exterior stair to access _ building shall be fully sprinkler through out wit...
KITCHEN AND 1-BATHROOM REMODEL (NO STRUCTURAL CHANGES) "COMPLY WITH DEPARTMENT ORDER effective date 12/20/2023. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE".
Back fill existing swimming pool with structural compacted fill and remove the shell.
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building C...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 29 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Supplemental to permit# 24014-10000-05343 to remove covered entry from project scope.
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).Kitchen remodel for residential buildings (no structural changes).
Fiber Cement siding over solid sheathing with an approved water-resistive barrier per valid ICC Evaluation Report # 2290 on exterior walls at 5 feet or more from property lines for residential buildin...
Add sill plate anchor bolts and plywood to cripple walls (if existing) per LA City Standard Plan #1; no foundation replacement (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building C...
Suppl. permit to 25047-20000-01518 to revise setbacks and details
Supplemental to 25014-10000-03592 to restamp lost set of plans
Supplemental to permit 25019-10000-02901 to restamp lost set of plans