Building Permits in ZIP 90077
Los Angeles, CA — 147 permits filed recently
147 permits
Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing___52___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone(VH...
Re-plaster existing swimming pool. The subject pool shall comply with the Swimming Pool safety act, according to Health and Safety Code 115920- 115929 through Senate Bill 552.
Supplemental permit to 22016 - 90000 - 15497 for transfer of permit from E & E BUILDERS INC, license # 1060959 to CASPI CONSTRUCTION, license # 1091631.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 50 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Eplan: Supplemental to 25014-10000-02775 To Revise the deck foundation.
Supplemental permit to 25016 - 90000 - 08904 to revise work description to add: Bathroom (1) remodel for residential buildings (no structural changes).
Eplan. Supplemental permit to 23014-10000-00787 to relocate the proposed Simpson Strong Wall (WSW24x8) to gridline B.1 to avoid underpinning work.
Supplenmental to 25014-10000-00978 to include minor remodel at east wing of (e) sfd
EPLAN NEW 15' X 30' DETACHED ACCESSORY DWELLLING UNIT PER GC 66323(a)(2) PER ENGINEERING. NFPA 13D FIRE SPRINKLERS THROUGHOUT.
Supplemental ref: 13047-30000-00645 to revise location of pool steps and size of baja shelf. Revisions and corrections to pool and spa size.
Supplemental ref: 13010-10000-01331 to revise entry water feature of dwelling. Revise size of landscape planters.
(18) Window change-out (same size & type) for residential buildings. Dual glazing, labeled andcertified by National Fenestration Rating Council (NFRC), is required for doors and windows replacedin all...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 28 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 42 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
ePlan: SUPPLEMENTAL PERMIT TO 25047-10000-00228 TO REVISE POOL DETAILING. No Change to pool dim.
Eplan. Addition to and convert (E) detached garage to ADU 600 sq.ft. Per LAMC 12.22 A.33(b)(1) 3
Eplan: Supplemental permit to 24014-10000-04871 to revise deck, deck details, proposed framing, and minor revisions to floor plans.
ePlan: Ground addition and remodel to existing to 2-story single family dwelling and attached to Exisitng 2-car garage, No change to 2nd floor.
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
ePlan Tenant improvement to (E) ACADEMIC BUILDING. GRADES 9-12