Building Permits in ZIP 90272
Los Angeles, CA — 1,026 permits filed recently
1,026 permits
2025 wildfire rebuild, single-family dwelling with an attached garage, (2)-story. nfpa 13d sprinklers throughout eo1
2025 wildfire rebuild, single-family dwelling with an attached garage, (2)-story. nfpa 13d sprinklers throughout eo1
2025 wildfire rebuild, single-family dwelling with an attached garage, 2-story. nfpa 13d sprinklers throughout. eo8
***2025 Eligible Wildfire Project Per Executive Order No. 1***New sitre reatining walls-- 3 of 3 --
2025 wildfire rebuild, single-family dwelling, (1)-story. nfpa 13d sprinklers throughout eo8
*2020 WILFIRE REBUILD E01 PROJECT* NEW 17' X 19'-2" ONE STORY ACCESSORY DWELLING UNIT PER GCS 65852.2(e)(1)(B) and LAMC 12.22 A.33(c)1, (d)1, and (g); EQUIPPED WITH NFPA 13-D FIRE SPRINKLERS THROUGHOU...
Supplemental permit to 25010-20000-01203 to revise work description to "****2025 wildfire rebuild eo8 eligible project**** new 84' x 138'-5" irregular shaped 1-story w/ 2-car garage over basement. nfp...
2025 WILDFIRE REBUILD, SINGLE-FAMILY DWELLING WITH AN ATTACHED GARAGE AND ACCESSORY DWELLING UNIT PER GC 66323(a)(1), 2-STORY. NFPA 13D SPRINKLERS THROUGHOUT INELIGIBLE
(6) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced i...
** 2025 Wildfire Ineligible Project **GRADING FOR NEW SFD (R&R).
Remove existing roof tiles, apply new underlayment and reset roof tiles (Cool roof compliance is not required)
***2025 Ineligible Wildfire Project*** New retaining wall
2025 wildfire rebuild, single-family dwelling with an attached garage, 2-story. nfpa 13d sprinklers throughout ineligible
***2025 Ineligible Wildfire Project*** Site grading for removal and recompaction for new 2-story single family dwlling w/ attached garage and ADU; backfill (E) swimming pool with certified soil, pool...
*2020 wildfire rebuild e01 project* grading for basement 800 cy
2025 wildfire rebuild, single-family dwelling with an attached garage and roof deck. (2)-story. nfpa 13d sprinklers throughout
***2025 Eligible Wildfire Project Per Executive Order No. 8*** New 1-story detached garage at rear of the lot. Fully sprinkled NFPA 13-D--- 2 of 2 ---
Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing 30 Squares. Class A roof covering is required within Very High Fire Hazard Severi...
2025 wildfire rebuild, single-family dwelling with an attached garage and basement, 2-story. nfpa 13d sprinklers throughout. eo1
*eplan* shoring for new single family dwelling with basement