reroofing hot works
reccommcement and completion of work approved under pa 202012090669 and 202307101776
repair less than 50% of front stairs in kind like for like.
demolish rear structure to comply with nov #202423506. convert e) fl bath to utility room & storage room. expand storage @ 1st fl, infill on the room and post. install exterior walls as was in the las...
to obtain final inspection for work approved under pa#202305318877. all work is complete.
revision to pa#202601164072: install (2) burner gas range at wet bar instead of electrical cooktop.
relocate water heater to different area in garage and repair sheetrock. replace a gas water heater with hybrid electric water heater. connect double 30 amp breaker.
remodeling kitchen and bathroom. no re-grout, no fixture relocation. all work in kind.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
repair exterior stair, in kind, less than 50%, facing the street, repair gas pipe near by gas meter.
unit 3: kitchen renovation, replace cabinets, electrical outlets, faucets, sink, countertops, garbage disposal, oven replacement. like to like
revision to pa 2023-0117-0234 replace garage concrete slab post footings and beams. new retaining walls in the backyard, building extends 16" in the back, new permeable pavers in the back. 14" of adde...
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
to obtain final inspection for work approved under pa#202109168538, 202201216372, 202203250876, all work is complete
2nd floor: (e) kitchen remodel. remove (e) closet adn widening of door way at the kitchen.
fire damage with in-kind repairs. all work will be completed to return the house to original conditions, including removal and replacement of the damaged (roof faming, interior and exterior finishes,...
kitchen remodel with same layout. change cabinets, countertop, and appliances as required by nov 2026-49003. items 2 and 3 of nov previously fixed awaiting inspection.
new pergola (freestanding) at an existing courtyard space between the (e) classroom building and theatre building.
underpin storage area to add (n) bedroom and bathroom at ground floor. remodel (e) bathroom and relocate kitchen on 2nd floor. (n) coneting interior stair to ground floor. dryrot repair at (e) kitchen...