Building Permits in ZIP 94112
San Francisco, CA — 349 permits filed recently
349 permits
revision to pa # 202507221354: add 1 new window 24"x26". add two burners stove in media room.
revision for pa# 202601274617: from stucco wall to wood siding. street visible.
demo existing landing and stairs and build new deck and stairs
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
solar permit: installing 22 solar pv modules, 440 watts per module, total no. of rating 9.68 kw. mounted: roof, ballasted: n, including 1 energy storage unit, of 240 vac, with 27.12 kwh each in capaci...
bathroom remodel (in kind): only work being done: replace vanity with a single sink. instalation of a new shower inclosure.no other work being done.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
modifications to an (e) multi-unit building. convert the (e) 2 car garage into an adu-one bedroom, one bath of 516sf per state adu policy
rear deck replacement. remove & replace deck and staris in kind.
reroofing. overlay (e) bur reoof with new tpo membrane adhered to (e).
1st floor bathroom remodeling like for like, no wall demolition or construction, no change in plumbing fixture count, dmj 03/13/2026;
revision to permit 202510217784. remove proposed heat pump and install furnace and ductwork at new adu.
to obtain final inspection for work approved under pa#202101263321, 202204132156, all work is complete
to obtain final inspection for work approved under pa#202002043504, 202406053818 all work is complete.
to obtain final inspection for work approved under pa#202002043503, 202502281364, all work is complete
comply with nov #201901041. 2nd fl: enclose the front entry way, new entry door and 2 windows. change front bedroom to dining room.
remodel bathroom in kind, hallway bathroom change tiles, sink, toilets
demo existing retaining wall & cmu fence, add a new permeable & grid apvers ramp for access from street, add new retaining wall between 145 & 149 goethe st.
fire damage, repair @ 1st flr; renovate (e) bathroom & kitchen @ 2nd flr; add new bathroom @ 2nd flr, expand (e) deck by 165 sf.
at 1st flr, remodel (e) floor space to two new bedroom, new bathroom, media and wet bar.